Before the last check

Final walkthrough — what to verify before your last payment

Your last payment is the only leverage you have. Use it. Don't sign off on the final invoice until you've walked the work, tested everything that should turn on, and collected the paperwork you're owed.

What to inspect — universal items

  • Project area is cleaned up — debris removed, no nails or screws left in the yard
  • All visible work matches the contract (materials, color, brand)
  • No new damage to adjacent areas (drywall, landscaping, siding, flooring)
  • Punch list items from earlier walkthroughs are completed
  • Any access panels or hidden inspections (attic, crawlspace) check out
  • Manufacturer model numbers and serial numbers documented for warranty

Roof

  • Walk around the perimeter — gutters, flashing, drip edge intact
  • Attic inspection: no daylight visible, no water stains, ventilation intact
  • Yard magnet swept for nails (especially around walking paths and pet areas)
  • Old shingles fully removed and hauled (verify the dumpster is gone)
  • Permit signed off by the city inspector

HVAC

  • System runs in both heat and cool modes
  • Filter is in and accessible
  • Thermostat is programmed and explained to you
  • Refrigerant lines insulated and clean
  • Condensate drain piped to an approved location
  • AHRI certificate matching the installed system (needed for warranty + tax credits)
  • Permit signed off by the city inspector

Plumbing

  • All new connections checked for leaks (run hot and cold)
  • Water heater temperature set to 120°F (per code, prevents scalding)
  • Shutoff valves work and aren't seeping
  • Drain lines slope correctly (no standing water in traps)
  • Permit signed off by the city inspector

Electrical

  • Every new outlet tested with a polarity tester (or just plug in a known device)
  • GFCI outlets in required locations (kitchens, baths, garage, exterior)
  • AFCI breakers in bedrooms and living areas (per code)
  • Panel labeling is current and legible
  • Permit signed off by the city inspector

Windows + siding

  • Every window opens, closes, and locks smoothly
  • Caulking around every opening is continuous and clean
  • Trim and J-channel installed cleanly, no exposed fasteners
  • Old material fully removed
  • Touch-up paint matches existing trim

Paperwork to collect before final payment

  • Signed final invoice with payment schedule fulfilled
  • Lien waiver (the contractor's statement they've paid their suppliers and subs)
  • Manufacturer warranty registration confirmation
  • Workmanship warranty document (written, dated, signed)
  • Permit close-out paperwork (signed inspector card)
  • Model + serial numbers for installed products
  • Operating manuals for any new equipment

If something isn't right

Write it down. Don't sign the final invoice. The conversation is: "We're almost there. Once these three items are resolved, I'll release the final payment." Most reputable contractors will fix the punch list quickly to get paid. If they push back, you have leverage — the final 10–20% is still in your account.

Lien waivers — don't skip this
If the contractor didn't pay their subs or material suppliers, those parties can file a lien against your home — even though YOU paid the contractor. A signed lien waiver at final payment is your protection. Insist on one.

Common questions

How long can I hold the final payment?
Until the punch list is done. Most contracts give the contractor a reasonable time to fix items (typically 30 days). After that you can usually withhold a proportional amount for the remaining defects until they're fixed. Check your contract for specific language.
Should I withhold the full final payment over a small item?
No — that's a quick way to end up in a contract dispute. Withhold an amount that's proportional to the unfinished work. A $200 cosmetic issue doesn't justify withholding a $5,000 final payment, but it does justify withholding $500 until it's fixed.
What's a lien waiver and why does it matter?
A lien waiver is a signed statement from the contractor confirming they've paid their suppliers and subcontractors for your project. Without one, if the contractor doesn't pay their bills, the unpaid parties can place a mechanic's lien on your home — even though you paid the contractor. The lien clouds your title and has to be cleared before you can sell or refinance.